Hazel Grove Elementary
Investing in a new facility that supports safety, accessibility and future-ready learning for students who attend Hazel Grove Elementary.
Project Scope and Cost
-
Scope: New school construction at a new site.
-
Estimated Cost: $44.5 million
- Original Build: 1940
Summary:
Design for exceptional learning spaces, with accessibility and safety for all, keeping character and charm at the center of Hazel Grove.
Building Priorities:
- Interior and Exterior Infrastructure Upgrades (New Construction)
- Future Ready Learning Space
- Program Facility Renovation
Rationale:
- Ensures Hazel Grove can adequately serve the needs of its current and future student population and provides safety and accessibility upgrades.
- Moves the elementary building away from road traffic.
- Puts the school at parity for the standard elementary campus size of 15-20 acres.
- The current campus is limited by its size and proximity to traffic, which limits the expansion necessary to meet student needs.
- Prepares Hazel Grove to accommodate anticipated growth in the North side of Lee’s Summit.
FAQs
- Why a new build?
- What will happen to the current Hazel Grove Elementary site?
- What would the new school look like?
- Where would the new school be located?
Why a new build?
What will happen to the current Hazel Grove Elementary site?
What would the new school look like?
Where would the new school be located?