Miller Park Center

Improving safety, accessibility and a connectivity at the Miller Park Center campus.

Project Scope and Cost

  • Scope: Guided Entry Addition and Program Improvements.
  • Estimated Cost: $6 million
  • Original Build: 1923

Summary:

Design spaces centered on students and accessibility excellence to provide high quality learning facilities for all students.

Building Priorities:

  • Accessibility Excellence and Safety
  • Program Facility Upgrades
  • Exterior Infrastructure Upgrades
  • Interior Infrastructure Upgrades

Rationale:

  • Completes 2020 vision to ensure a cohesive and accessible campus that serves students with specific needs.
  • Enhances connectivity and oversight across the three-building campus by creating a new secure and accessible entryway on the south side of campus, improving accessibility and ease of navigation for all visitors.
  • Includes a redesign of the parking lot to enhance safety, with improvements to the drive lane, bus loop, and entry/exit points
  • Frees up classroom space to use for student instruction.